Giving Students a Brighter Space

Solatube

Solatube skylights helped bring light to “the cave” at Waukesha Technical College, giving students a brighter space in which to learn and eat.

Waukesha Technical College (WCTC) is a public technical college located in Waukesha, WI, outside of Milwaukee. The school has over 23,000 students enrolled in a variety of degree programs. One of the key areas for students to study and eat is called the Service Building.

Students traditionally referred to the student gathering space as “the cave” since it was dark and gloomy. The challenge was to renovate the existing space within the budget of $600,000 but transform it from a cave-like space to a place where students could study and socialize in an environment filled with daylight.

According to Matthew Kerr, IIDA, ASAI, senior associate and interior designer at Zimmerman Architectural Studios, one of the main drivers of the renovation was allowing the space to be filled with natural light and creating auditory separation without disrupting the visual “openness” of the existing space. “The large glass wall around one of the meeting areas helped the tubular daylighting devices and lanterns do their job,” Kerr says.

The project used 12 SkyVault M74 core units, integrated with LED lighting for night use and maximum lighting energy efficiency. Custom square-shaped fabric lanterns were created as decorative elements at the ceiling level.

“The student lobby in the Service Building went from being an underused, dark space to a vibrant and active hub for students. It’s amazing what a building remodel that factors in natural light can do for one’s psyche! The Solatube units made this possible,” says Brooks Kyler-Eberlein, WCTC Interior Design instructor.

Keith Johnson, owner of Brighter Concepts, handled the Solatube SkyVault units and installation.

“The cave-like environment of the student gathering area was very oppressive,” Johnson says. “It was truly incredible to see the transformation of the space once the Solatube SkyVault units were installed.”

www.solatube.com

This article originally appeared in the issue of .

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Kraus-Anderson Continues Work in Minnesota School District

    Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release.

  • Kimball International Launches Season 5 of Alternative Design Podcast

    Commercial furnishings manufacturer Kimball International recently premiered the fifth season of its Alternative Design podcast, according to a news release. The first episode was released on March 17, and new episodes will launch monthly. The podcast discusses forces that shape built environments, from work to housing to healthcare to human wellness.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.